ZON HOMES

Planning · Quality · Delivery

A clear route from land to finished home.

Plot, planning, build and handover: what happens at each stage, and what you decide.

Book a feasibility call

Feasibility comes first — we review your plot before anything is designed

ZON timber-frame panels being made in a bright factory

Planning & feasibility

Land first. Certainty next.

Before anything is designed, we review access, services, boundaries and the planning route most likely to succeed.

What we assess

  1. Site access, orientation & boundaries
  2. Existing services & utility connections
  3. Ground conditions & drainage
  4. Planning history & local policy
  5. Permitted development vs. full planning route

Planning outcomes depend on the local authority, site history and current policy. ZON coordinates the process; consent decisions sit with the relevant planning authority.

Delivery timeline

From first idea to finished home.

  • Up to 6 monthsTypical full project route
  • 3–14 daysTypical on-site assembly
Watch: how a home is built · 0:29
  1. Feasibility

    We review the plot, brief, scope and constraints.

  2. Design & planning

    Architecture and technical design are coordinated before production.

  3. Manufacture

    The structural system is produced in controlled conditions.

  4. Delivery & completion

    Transport, assembly, fit-out and handover follow the agreed scope.

Inside a ZON home

Warm, quiet and solid. Layer by layer.

Every wall and roof panel is made and checked in the factory, then assembled on your plot. Tap a number to see what each layer does for you.

Section through a ZON timber-frame home showing roof, wall and foundation layers

Your facade

Same quality inside. Your look outside.

See facades and cladding

Free sample box

Touch it before you choose it.

Pick the materials you are curious about — facade, parquet, terrazzo, wall panels, oak veneer — and we will send real samples to your door in the UK, free.

  • Facades
  • Parquet
  • Terrazzo
  • Wall panels
  • Oak veneer
What would you like to feel?

When the catalogue is not the answer

Your brief. The right route.

No model fits? We adapt the closest ZON platform first, and design bespoke only when the plot needs it.

Start a bespoke brief

Quality assurance

Performance is designed in.

W/m²K wall U-value
0.170
W/m²K roof U-value
0.109
fire target
REI 60
Rw index
46 dB
Request technical information

Completion levels

What does turnkey mean?

A clear comparison between an installed shell and a home completed for final handover. The exact scope is fixed in your project specification.

Oak kitchen and open-plan living space in a finished ZON home

Turnkey home

Completed for final handover.

A fully managed home completed to the agreed specification, with building services, fitted rooms and internal finishes coordinated through one project team.

  • Everything included in the installed shell
  • Electrical installation and certification
  • Plumbing, heating and ventilation
  • Internal walls, flooring and decoration
  • Fitted kitchen and bathrooms
  • Internal doors and joinery
  • Testing, inspection and handover documentation

Confirmed for each plot

Site-specific items are priced clearly — not hidden.

Foundations, groundworks, utility connections, drainage, access arrangements, planning requirements and external landscaping are assessed for the individual plot and stated in the project proposal.

See what your turnkey home includes

ZON Energy is an optional Stage 2 package and is not included in the base home price.

Clear package pricing

Shell and turnkey. Clearly separated.

Every figure states exactly how far ZON takes the build.

ModelDelivery routeStarting price
Lake House Standard
92.2 m² / 992 ft²
Installed shellFrom £80,000
Lake House Standard
92.2 m² / 992 ft²
TurnkeyFrom £190,880

Installed shell covers the structural envelope, delivery and assembly. Turnkey adds the agreed interior and services. Foundations, site works, utility connections and VAT remain subject to the project proposal.

A ZON barn house with solar roof, heat pump and an electric car charging

ZON Energy · Optional stage 2

Energy-ready from day one.

Heat pump, solar, battery and EV charging — a separate, opt-in stage, never bundled into the home price.

Try it on our house

Landowner FAQ

Questions we hear from landowners.

Do I need planning permission before I contact ZON?

No — feasibility comes first. We review your plot and identify whether permitted development or a full planning application is the right route.

Can modular homes add a secondary income unit?

Often, yes, subject to site constraints and local planning policy. The route can range from a garden studio to a phased multi-home scheme.

What ground conditions affect suitability?

Access, drainage, soil-bearing capacity and existing services all factor into feasibility. A site survey confirms the final route.

How long does the whole process take?

A typical full project route can take up to six months, with on-site assembly typically taking 3–14 days after manufacture. Exact timing depends on planning and access.

Can I get finance against land and build?

ZON can prepare plans, specifications and a cost schedule for lender review. ZON is not a mortgage adviser and does not guarantee eligibility.

What if I have not decided what to build?

That is a normal starting point. A feasibility call considers the plot and brief together so the realistic scale and next steps become clear.

Start with the land

Build a clearer starting picture.

Tell us about the plot, preferred home and delivery scope.

Book a feasibility call

Feasibility comes first — we review your plot before anything is designed

Get price